MemloHow to use AI(with a little bit of product placement)

Memlo for environmental consulting firms

How to use AI

Free training on AI for environmental consulting firms. Learn how to use AI on real project work: field checklists, client updates, report drafts and finding what your firm did before. It takes about 30 minutes, learned while doing your own work.

0 of 8 lessons done
Start

The lessons: AI for environmental consulting firms

  1. Lesson01

    What AI is good at and what it gets wrong.

    Where AI helps on project work, and where it can mislead you.

    5 minNext
  2. Lesson02

    How to ask a good question.

    Clear requests get useful field checklists, emails and outlines.

    5 minNot started
  3. Lesson03

    Always check the source.

    Check reports, lab data and the agency's current guidance.

    4 minNot started
  4. Lesson04

    What not to paste into AI.

    Keep confidential client files, access codes and private details out.

    4 minNot started
  5. Lesson05

    Using AI with your company's knowledge.

    Find past reports, field notes and agency letters with sources.

    5 minNot started
  6. Lesson06

    Drafting emails and documents.

    Turn field notes into client updates the PM reviews and sends.

    5 minNot started
  7. Lesson07

    Turning notes into checklists and summaries.

    Turn site visit notes into a summary and a follow-up checklist.

    5 minNot started
  8. Lesson08

    Making AI part of your week.

    Plan field work on Monday, wrap up on Friday.

    4 minNot started

Want your whole team to take it? Share this free AI training with your team. Curious what Memlo itself does? See how Memlo works for environmental consulting firms.

Try it now

Copy one of these prompts into your AI tool and see what happens.

Summarize what we found at the Cedar Hollow site, with sources.
Draft a client update from these field notes. Don't add findings.
Turn these site visit notes into a follow-up checklist.

Free AI training for your team, inside Memlo

Soon each person on your team will add Memlo and get the free training space for environmental consulting work, with the AI coach built in. Ask us for more information and we'll reach out.

Get more information about Memlo for your team
Lesson 05

Using AI with your company's knowledge

5 min

Your firm already has useful information in past reports, field notes, emails, and project files. Memlo connects that information so AI tools like ChatGPT, Claude, Copilot, and Gemini can find and cite it. Instead of searching through folders yourself, you can ask a question about a past project and get an answer with sources. AI only has access to information you are already allowed to see. You still need to check the original documents before using the answer.

Worked example
QUESTION

What did we find during the 2023 groundwater investigation at the Cedar Hollow Industrial Site (CH-2217)?

AI ANSWER

I'm sorry, I don't have details about that. Can you manually track down all the context I need from related files and paste it in here first?

This user could have avoided this fate with Memlo.

1

Track down the context first.

Without a connection to your firm's files, AI knows nothing about your projects. Find the reports, field notes and letters about the question, and paste the relevant parts in yourself.

2

Paste only what is approved.

Share only what your firm allows in that AI tool, and leave out confidential client details, personal information and access codes.

3

Check the originals.

Compare the answer with the documents you pasted from. A summary does not replace professional review.

With Memlo

QUESTION

What did we find during the 2023 groundwater investigation at the Cedar Hollow Industrial Site (CH-2217)?

AI ANSWER

Here's a summary of the Cedar Hollow groundwater investigation based on your firm's connected files. 1. The investigation included soil borings and groundwater sampling to evaluate potential TCE impacts. 2. The August 28, 2023 Phase II ESA describes the investigation activities and reports TCE detections in groundwater samples. 3. Boring logs B-1 through B-12 document subsurface conditions encountered during the field investigation. 4. The September 14, 2023 State Agency letter discusses the project and requests additional information about groundwater conditions. This summary does not establish whether the site meets a regulatory standard. Review the original results, laboratory data, and current agency requirements before drawing conclusions.

FOLLOW-UP QUESTION

Did we complete the additional groundwater sampling requested after the September 14, 2023 agency letter? What were the results?

AI ANSWER

I couldn't find a follow-up groundwater sampling report or laboratory results documenting that work in the connected files I can access. The September 14, 2023 agency letter discusses additional information, but I cannot confirm from the available records whether the sampling was completed. You may want to check the project's later field notes, laboratory records, and correspondence with the agency, or ask the project manager. I won't assume the work was completed or invent results.

The same question, answered from your firm's own files, with sources, and nothing to find or paste. People only see what they could already see, and when something isn't in the files, the AI says so instead of guessing.

Not on Memlo yet?

Ask your favorite AI tool about it. Open it in ChatGPT or Claude with this prompt already filled in, or copy it into any AI tool.

Read memlo.ai/environmental-consulting-agent.md. For the rest of this chat, be the friendly Memlo guide it describes. Start by getting to know my business, one short question at a time. Use what you already remember about me and my work from our past chats to show real examples of where Memlo would have helped, and tell me which conversation each one comes from. Keep replies casual and under 80 words, no reports or tables, and only Memlo facts from that page. When I'm interested, tell me to email sales@memlo.ai and offer to draft that email for me.

Try it in ChatGPT · Try it in Claude

Do this

  • Ask AI questions about past projects using your firm's connected knowledge.
  • Look for source references and open the original reports, field notes, or correspondence.
  • Ask AI to identify missing information instead of filling gaps with assumptions.

Avoid this

  • Don't treat an AI summary as a replacement for the original technical documents.
  • Don't assume a project activity never happened because AI cannot find a record of it.
  • Don't use a cited result to make a regulatory determination without checking the data, current requirements, and professional interpretation.

Try it now

Copy this prompt into your own AI and see what you find.

Using my firm's connected project files, find a past Phase II ESA or groundwater investigation. Summarize the field activities, laboratory results discussed in the report, and any follow-up items. Cite the documents you used. If a result or follow-up record is missing, say so instead of guessing. Do not make regulatory conclusions.
What to look for

An answer based on your firm's actual records, with sources you can open and verify. Check that the cited documents support the claims. If the files do not contain an answer, AI should say what is missing rather than invent information.

Want an even better training?

Memlo makes it easy to onboard with customized training for your employees.

We'll email you when the trials are opened up.