AI for pipeline contractors

Memlo is more than a second brain

Memlo keeps track of what matters for your pipeline contracting business.

Memlo is AI for pipeline contractors and service firms. It learns from your bid files, daily reports, procedure packages and field notes, so ChatGPT, Claude or any AI tool your team uses can find what your crews did before and show the record it came from.

Leave your work email and we'll reach out.

Add details (optional)

See where it fits your business: Try it in ChatGPT · Try it in Claude

FindsPast jobs, reports and records
DraftsReports, summaries and checklists
NeverApproves, signs or certifies
A muddy pipeline right-of-way on an overcast day, with coated pipe on skids beside an open ditch

An estimator asked Memlo before pricing the Sandhill Lateral:

What did we run into on the Mill Creek HDD crossing that the Sandhill Lateral estimate should account for?

Memlo found three things in the Bitter Creek Loop records from August 2022.

1

The pilot bore lost circulation on day 3. Most of that shift went to drilling fluid recovery.

Daily report, Spread 1, August 14, 2022Bitter Creek Loop/Daily reports/DR-2022-08-14.pdf

2

The landowner on the entry tract required timber mats and daylight-only access. Staging took two extra days.

Landowner line list, entry tract notesBitter Creek Loop/ROW/Line list rev 7.xlsx

3

A pullback test was added before the final pull. The pull moved back one day.

Lessons learned log, HDD crossing reviewBitter Creek Loop/Closeout/Lessons learned.docx

Memlo does not price the bid. Your estimator decides what goes into the Sandhill Lateral estimate.

Over the shoulder of a pipeline worker on a muddy right-of-way, face not shown, holding a rugged tablet that shows a Memlo answer about the Mill Creek HDD crossing: lost circulation on the pilot bore, the entry tract's mats and daylight-only access, and the pullback test, each with its source record

What Memlo remembers for your company

Memlo keeps what your firm already writes down, from the first bid to the turnover package, and keeps track of which job and which file each piece came from.

Close-up of a coated field joint on a pipe, with a shrink sleeve over the girth weld and mud on the coating

Bids and estimates

The assumptions, exclusions and crew productivity from earlier jobs, so a new estimate starts from what actually happened instead of memory.

Bitter Creek Loop/Bid/Assumptions rev C.xlsx

Procedures and qualifications

Procedure specifications, procedure qualification records and welder records. Memlo finds and explains them; it never qualifies a procedure or a welder.

Procedures/PP-24-003 cold weather.pdf

Daily reports and field notes

Crew activity, footage, weather, delays and superintendent notes from every spread, searchable by station, date or crew.

Sandhill Lateral/Spread 2/Daily reports/

Inspection and test records

NDT reports, coating and holiday tests, and hydrotest charts, kept and found when someone asks. Memlo never signs or accepts a result.

Sandhill Lateral/Test section 3/Hydrotest/

Right-of-way and landowner notes

Access limits, line list notes, gate and matting requirements, and restrictions along the route, tied to the tract they apply to.

Sandhill Lateral/ROW/Line list rev 4.xlsx

Lessons learned, safety meetings and equipment

Past issues, toolbox talk notes and equipment history, so the next crew sees what the last one wrote down.

Closeout/Lessons learned/

A map of your equipment and everything connected to it

Memlo builds a map of the equipment, crews, projects, welds and issues in your records, and links each one to the records that mention it. Point at a unit to see where it worked, what went wrong and which reports say so.

Show

An example map built from a fictional contractor's records.

A tarped welding shack set over a tie-in joint on a coated pipe string, with a welder's rig truck and its leads running across the mud

Questions your crews ask

Ask in plain language from the AI tool you already use. Memlo answers from your records and lists the files it used.

Which procedure and welders did we use on 24-inch pipe in cold weather on the Bitter Creek Loop, and what repairs came up?

FoundThe Bitter Creek Loop used procedure package PP-24-003 for 24-inch pipe in cold weather. The welders are listed in the qualification records for that spread. The repair log shows two cap repairs and one underfill repair, each with its inspection record.

SourcesProcedure package PP-24-003Welder qualification recordsRepair log, Spread 1

Draft today's Spread 2 report for the Sandhill Lateral from the foremen's notes, the footage tally and the weather log.

DraftedCrews strung and welded 1,246 feet of 24-inch mainline from station 413+20 to 425+66, completed 11 welds with visual inspection, and backfilled 960 feet. No repairs were logged. Light snow in the morning, 34 to 41 degrees, wind 10 to 15 mph. Ready for the superintendent to review and send.

SourcesForemen's notes, 3 crewsFootage tallyWeather log

What is still missing from the turnover package for test section 3?

FoundThree items are not in the package yet: the signed NDT summary, the hydrotest chart with its pressure and hold record, and the as-built tie-in sketch at station 416+00. The checklist shows who owns each one.

SourcesTurnover checklistNDT summary indexHydrotest folder

Memlo finds and drafts from your records. A qualified person on your team reviews, decides and signs.Example projects are fictional

How it works

Your team keeps its files where they are today. Memlo reads from them and answers from the AI tools people already use. How Memlo works for pipeline contractors.

Step 1

Connect your email, notes, chat and files

Memlo reads the records your team already keeps, such as bid folders, daily reports and procedure packages, and learns which job each one belongs to.

Step 2

Ask from ChatGPT, Claude or any AI tool

Connect once. After that, anyone on the team asks from the AI tool they already use, in the office or from a truck.

Step 3

Get answers with links to the sources

Every answer lists the files it came from, so the person asking can open the record and check it before using it.

Stacks of coated pipe on timber dunnage in a wet gravel pipe yard

Built for estimators, field supervisors and QA/QC

Estimators and project managers

Pull the assumptions, exclusions, production history and lessons learned from jobs like the Bitter Creek Loop when you put together the next one, like the Sandhill Lateral.

Past crew productivity by spreadExclusions used on similar jobs

Superintendents and foremen

Find what happened on earlier spreads, draft the daily report from the foremen's notes, and find field notes without digging through email or folders.

Daily report draftsWhat happened at a station

Welding, QA/QC and document control

Locate procedures, qualification records, test records and turnover package details. Your qualified staff keep every judgment and every signature.

Turnover package gapsWhich procedure a weld used

Privacy and security

Your project records stay your firm's records. Here is what Memlo does with them, and what it does not do.

Access follows the source

People only see answers from records they could already open. Someone in the field doesn't see the estimating folder unless they could already open it.

Every change is versioned

When a record is updated, Memlo keeps the earlier version, so the team can see what changed and when.

Never sold or used to train AI

Your firm's information is not sold, and it is not used to train AI models, ours or anyone else's.

Encrypted in transit and at rest

Information is encrypted while it moves between systems and while it is stored.

Export or delete at any time

The firm can export everything Memlo holds, or delete a record, a project or the whole account.

Memlo does not qualify, inspect or certify

It finds, drafts and explains from your records. Your qualified people keep every judgment, approval and signature.

Questions about AI for pipeline contractors

Will other people on the team see my project records?

Only if they could already open them. Access follows the source, so people see answers from the records they already have access to and nothing else.

Is project information used to train AI?

No. Your records are not used to train AI models, and they are never sold.

Which AI tools does Memlo work with?

ChatGPT, Claude and other AI tools that can connect to an outside memory. Your team keeps using the tool they already know.

Does Memlo approve welding, QA or engineering work?

No. Memlo finds, drafts and explains from your records. It does not qualify welds or procedures, sign inspection or test results, or give engineering or safety direction. A qualified person on your team does that.

Can I export or delete information?

Yes. You can export everything, or delete a single record, a project or the whole account at any time.

Aerial view of a cleared pipeline right-of-way through farmland in early winter, with the open ditch and vehicle tracks in the mud

Get more information

Put your bid files, daily reports, procedures and field notes to work with Memlo.

Leave your work email and we'll reach out.

Add details (optional)