Memlo for pipeline contractors
How Memlo works for pipeline contractors
Memlo is AI for pipeline contractors. It keeps your company's job history available to every AI tool your team uses: past bids, daily reports, procedure and qualification records, test records and project email, each answer linked to its source.
ESWhat did we run into on the Mill Creek HDD crossing on the Bitter Creek Loop?
The pilot bore lost circulation on day 3, and the crew spent most of that shift on drilling fluid recovery. The landowner on the entry tract required timber matting and daylight-only access, so staging took two extra days. A pullback test was added before the final pull. These are the sources:
All your company's context in one place
Everything your company knows about past spreads, bids, crossings and test sections lives in one place, so ChatGPT, Claude, Copilot and Gemini all answer from the same past work and point to the same sources.
- ChatGPT
- Claude
- Copilot
- Gemini
Find any past job, spread or crossing
Ask in plain language and get the right bids, daily reports, procedure records, test records and correspondence from past jobs, without digging through project folders or old email.
Show me everything on the Bitter Creek Loop.
- Bid package and clarifications, Bitter Creek LoopFeb 2022
- Daily reports, Spread 1, 94 reportsMay-Sep 2022
- Procedure package PP-24-003, cold weatherApr 2022
- Hydrotest records, test section 2Sep 2022
- Email thread, Mill Creek crossing accessJul 2022
- Lessons learned log, closeoutOct 2022
Connect the tools you already use
Bring in what you already work from: documents, email, chat and notes. Memlo learns from it and keeps up as it changes, and people only see what they could already see.
Tell any AI tool to remember
When a decision is made on a job or a landowner adds a requirement, tell the AI tool you're using to remember it. It's saved to Memlo, so it's there on the next question, in any tool.
Remember this from today's tailgate meeting: the landowner on the tract at STA 412+60 wants the gate kept closed and timber mats down before any equipment crosses the wet ground.
Saved to Memlo.
Context from past conversations
What your team discussed on past jobs can inform today's answers, with a link back to each conversation it came from.
PMWhat did we tell the landowner about access to the Mill Creek entry tract on the Bitter Creek Loop?
The project manager agreed to daylight-only access and timber matting on the entry tract, and to send notice two days before the HDD rig moved in. The crew followed that plan, and staging took two extra days.
- Entry tract access, call notes with the landownerJul 11
- Matting and hours, email threadJul 12
- Rig move notice, team chatAug 9
A map of everything you know
See how jobs, spreads, crossings, procedures, test sections and tracts connect, so everything related to a job is one step away.
Explore your memory
Browse by job, spread, crossing or kind of work, and move from a job to every bid, daily report, procedure and test record behind it.
Explore your memory
- Bitter Creek Loop (2022)
- Sandhill Lateral
- Mill Creek HDD crossing
- Station tie-in work
Bitter Creek Loop (2022)
24-inch loop · 42 related items- Bid package and clarifications4
- Daily reports9
- Procedure and test records9
- Emails7
- Documents2
A page for every job
Every job gets a page that brings together its summary, key documents, notes and related work, kept up to date from the sources.
A 38-mile, 24-inch natural gas lateral. Spread 2 is welding between STA 410+00 and 425+66, and test section 3 is being prepared for hydrotest. Turnover items to confirm.
- Alignment sheets, rev 4Sep 2026
- Turnover checklist, test section 3Oct 2026
- Bid packageMar 2026
- Spread 2 tailgate meetingOct 21
- Tie-in plan at STA 416+00Oct 24
- Line list notes, rev 4Oct 18
Keep your context current
As new daily reports, field notes, test records and emails come in, Memlo adds them to the company's memory, so the next answer includes them.
- Daily report, Spread 2, Sandhill LateralOct 25
- Email from the landowner, tract accessOct 26
- Weld log, Spread 2Oct 27
- Foreman notes, test section 3Oct 27
Every change is versioned
Every page keeps its full history. See what changed and when, compare two versions, and restore an earlier one if you need it.
- Oct 18, 2022, 4:12 PMLessons learned from the closeout review added.CompareCurrent
- Sep 9, 2022, 6:40 PMHydrotest records for test section 2 added.CompareRestore
- Aug 20, 2022, 5:55 PMMill Creek HDD crossing notes added.CompareRestore
- Feb 14, 2022, 9:02 AMPage created from the bid package and the award letter.CompareRestore
Teams and team spaces
Set up your company once and invite your people. Each team gets a team space its members read and add to, so a job's history stays with the company, not one person's inbox. Your own space stays private to you.
Your company48 people
- Spread 2 team4
- Estimating5
- Welding and QA/QC3
Your own spaceOnly you
Spread 2 team
Team space · read and added to by its members- Project managerSandhill LateralMaintainer
- Spread superintendentSpread 2Editor
- QA/QC managerWelding and test recordsEditor
- Document controllerTurnover packagesViewer
Privacy and security
Your bids and project records are never sold and never used to train AI models. They are encrypted in transit and at rest, and you can export or delete them whenever you want. Memlo finds, drafts and explains; it does not price or approve bids, qualify welds or procedures, sign inspection or test results, or give safety or engineering direction. A qualified person on your team reviews, decides and signs.
- Never sold or used to train AI
- Encrypted in transit and at rest
- Export anytime
- Delete anytime
How to start with AI for pipeline contractors
Ask us for more information and we'll reach out. Once your team is set up, connect your email and files, add Memlo to your AI tool in one step, and ask about a past job, like the Mill Creek HDD crossing. New to AI? Take the free training on how to use AI, or share the free AI training with your team.
Leave your work email and we'll reach out.
Add details (optional)
By sending this, you agree to our Privacy Policy.